Line 35: Line 35:
 In week 5, we focused on the project development chapter as well as on Jira. During this time, we planned in more detail which tasks need to be completed before the interim deadline in April. In addition, we created detailed schematics. However, we still need to continue working on how we want to implement all the electrical components. On the other hand, we also completed more detailed structural drawings. Based on these, we were able to decide on a more final shape for the capsule, as well as define the material layers and what should be included. Beside of that, we worked on a presentation about an ethical scandal, as well as a joint presentation summarizing all the work completed so far for the marketing and communication courses. In week 5, we focused on the project development chapter as well as on Jira. During this time, we planned in more detail which tasks need to be completed before the interim deadline in April. In addition, we created detailed schematics. However, we still need to continue working on how we want to implement all the electrical components. On the other hand, we also completed more detailed structural drawings. Based on these, we were able to decide on a more final shape for the capsule, as well as define the material layers and what should be included. Beside of that, we worked on a presentation about an ethical scandal, as well as a joint presentation summarizing all the work completed so far for the marketing and communication courses.
  
-==== 6th Week Report ====+==== 6 + 7th Week Report ==== 
 +During the Easter break, we focused on preparing the interim presentation. We discussed which aspects are most important and how to present them effectively, given that we only have 10 minutes. In addition, we finalized the interim report and revised several sections. In particular, we completed the ethics, project management and design solution chapters. For the next steps, we identified the need to work on the software side by developing an app and outlining how the prototype will be built. Furthermore, we will need to define the functionalities in more detail and determine how they will be implemented in the app. Finally we also enjoyed the break :)
  
 ===== Meetings ===== ===== Meetings =====
Line 147: Line 148:
   - The materials voltage matching voltages and detailed schematics power supply   - The materials voltage matching voltages and detailed schematics power supply
    
 +==== 7th Meeting (2026-04-16) ====
 +=== Agenda: ===
 +  - Interim Presentation
 +
 +=== Minute: ===
  
      
  • log.1775040990.txt.gz