log [2026/06/03 15:05] – [13th Meeting (2026-06-03)] team2log [2026/06/12 13:25] (current) – [14th Meeting (2026-06-11)] team2
Line 53: Line 53:
  
 ==== 12th Week Report ==== ==== 12th Week Report ====
 +This week, the team continued working on the technical development, documentation and visualization of the Bloem capsule. Significant progress was made on the integration of internal functions into the 3D model, alongside further refinement of the capsule structure. In parallel, rendering work was initiated to visually communicate the design and its key features. At the same time, several development and analysis tasks were completed, including stress analysis (material selection, force definition, mesh and simulation), functional testing documentation, and various Arduino-related implementations such as the on/off button and LED integration. The mobile application was also further developed, focusing on hardware integration, navigation and build stability. On the documentation side, the scientific paper was further advanced, particularly regarding personal outcomes, while additional sections such as the proposed solution documentation are still in progress. Marketing-related deliverables, including the poster design and supporting references, were completed successfully, along with final documentation outputs such as the user manual, installation instructions, and copyright page.
 +
 +==== 13th Week Report ====
 This week, the team continued working on the technical development, documentation and visualization of the Bloem capsule. Significant progress was made on the integration of internal functions into the 3D model, alongside further refinement of the capsule structure. In parallel, rendering work was initiated to visually communicate the design and its key features. At the same time, several development and analysis tasks were completed, including stress analysis (material selection, force definition, mesh and simulation), functional testing documentation, and various Arduino-related implementations such as the on/off button and LED integration. The mobile application was also further developed, focusing on hardware integration, navigation and build stability. On the documentation side, the scientific paper was further advanced, particularly regarding personal outcomes, while additional sections such as the proposed solution documentation are still in progress. Marketing-related deliverables, including the poster design and supporting references, were completed successfully, along with final documentation outputs such as the user manual, installation instructions, and copyright page. This week, the team continued working on the technical development, documentation and visualization of the Bloem capsule. Significant progress was made on the integration of internal functions into the 3D model, alongside further refinement of the capsule structure. In parallel, rendering work was initiated to visually communicate the design and its key features. At the same time, several development and analysis tasks were completed, including stress analysis (material selection, force definition, mesh and simulation), functional testing documentation, and various Arduino-related implementations such as the on/off button and LED integration. The mobile application was also further developed, focusing on hardware integration, navigation and build stability. On the documentation side, the scientific paper was further advanced, particularly regarding personal outcomes, while additional sections such as the proposed solution documentation are still in progress. Marketing-related deliverables, including the poster design and supporting references, were completed successfully, along with final documentation outputs such as the user manual, installation instructions, and copyright page.
  
Line 245: Line 248:
 At today’s meeting, we reviewed our paper and received a few minor corrections that need to be completed before 05-06-26. We need to insert an image of our proposed solution. Additionally, we must add elements to the results section based on the functional testing of our app. At today’s meeting, we reviewed our paper and received a few minor corrections that need to be completed before 05-06-26. We need to insert an image of our proposed solution. Additionally, we must add elements to the results section based on the functional testing of our app.
 We also discussed ideas for our video, which we will continue working on in the coming period. We also discussed ideas for our video, which we will continue working on in the coming period.
 +
 +==== 14th Meeting (2026-06-11) ====
 +=== Agenda: ===
 +  - Report
 +  - Prototype
 +  - Video
 +
 +=== Minute: ===
 +At today’s meeting, we went through the final details before submission. Once each chapter is completed, we can notify the individual supervisors. We have spoken with everyone except the project management supervisor, whom we will inform once everything is finished.
 +
 +Benedita will soon send out an evaluation form. As with our interim report, we all need to complete it.
 +
 +By 25-06-2026, we must have finished our prototype. The poster must be printed in A3 format. Likewise, our other communication materials must also be printed (leaflet, flyer, and user manual). On this day, we should also bring food/a snack from our own country.
 +
 ===== Activities ===== ===== Activities =====
 +
  
  