report:prm

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
report:prm [2026/06/14 22:21] – [Sprint 13] team2report:prm [2026/06/14 22:40] (current) – [Sprint 5] team2
Line 15: Line 15:
 **3.2 Time** **3.2 Time**
  
-In this section, we lay out the schedule and all the major deadlines we have to hit throughout the semester. this is shown in Table {{ref>tab:milestones}}. Tracking these milestones is really important because it keeps the whole team accountable and makes sure we're actually making steady progress on Bloem. It also helps us see if we're falling behind early on, so we can fix things before they become a real problem.+In this section, we lay out the schedule and all the major deadlines we have to hit throughout the semester. This is shown in Table {{ref>tab:milestones}}. Tracking these milestones is really important because it keeps the whole team accountable and makes sure we're actually making steady progress on Bloem. It also helps us see if we're falling behind early on, so we can fix things before they become a real problem.
  
 <WRAP 80%> <WRAP 80%>
Line 394: Line 394:
 | 2 | "Black box" System Diagrams | 3 | Everyone | Everyone | | 2 | "Black box" System Diagrams | 3 | Everyone | Everyone |
 | 2 | Structural Drafts | 4 | Carlota | Everyone | | 2 | Structural Drafts | 4 | Carlota | Everyone |
-| 2 | Write Background and Related Work chapters | 3 | Amelia & Timon | Everyone |+| 2 | Write Background and Related Work chapters | 3 | Amalie & Timon | Everyone |
 | 2 | Brainstorm other ideas inside the Smart Buildings topic | 5 | Everyone | Everyone | | 2 | Brainstorm other ideas inside the Smart Buildings topic | 5 | Everyone | Everyone |
 | **12/03/2026 - 18/03/2026** | | | | | | **12/03/2026 - 18/03/2026** | | | | |
Line 402: Line 402:
 | 3 | Improve BlackBox Diagram | 2 | Lena | Everyone | | 3 | Improve BlackBox Diagram | 2 | Lena | Everyone |
 | **19/03/2026 - 25/03/2026** | | | | | | **19/03/2026 - 25/03/2026** | | | | |
-| 4 | Detailed System Schematics | 5 | Amelia | Everyone |+| 4 | Detailed System Schematics | 5 | Amalie | Everyone |
 | 4 | Structural Drawings | 5 | Carlota | Everyone | | 4 | Structural Drawings | 5 | Carlota | Everyone |
 | 4 | Cardboard scale model of Bloem | 3 | Kaiko | Everyone | | 4 | Cardboard scale model of Bloem | 3 | Kaiko | Everyone |
Line 412: Line 412:
 | 5 | Reworking Schematic Drawings | 4 | Amalie | Everyone | | 5 | Reworking Schematic Drawings | 4 | Amalie | Everyone |
 | 5 | Creating Case Study Presentation (Ethics) | 3 | Mohammad | Everyone | | 5 | Creating Case Study Presentation (Ethics) | 3 | Mohammad | Everyone |
-| 5 | Creating the brand identity | 4 | Carlotta | Everyone |+| 5 | Creating the brand identity | 4 | Carlota | Everyone |
 | 5 | Updating marketing brand | 3 | Timon | Everyone | | 5 | Updating marketing brand | 3 | Timon | Everyone |
 | 5 | Smart System HW | 5 | Amalie | Everyone | | 5 | Smart System HW | 5 | Amalie | Everyone |
Line 426: Line 426:
 | 7 | Uploading the Report | 5 | Everyone | Everyone | | 7 | Uploading the Report | 5 | Everyone | Everyone |
 | 7 | Practising the presentation | 4 | Everyone | Everyone | | 7 | Practising the presentation | 4 | Everyone | Everyone |
-| 7 | Project Development | 3 | Carlotta | Everyone |+| 7 | Project Development | 3 | Carlota | Everyone |
 | **16/04/2026 - 22/04/2026** | | | | | | **16/04/2026 - 22/04/2026** | | | | |
 | 8 | Meeting regarding the electrical schematics with Luis | 4 | Amalie & Timon | Everyone | | 8 | Meeting regarding the electrical schematics with Luis | 4 | Amalie & Timon | Everyone |
 | 8 | Creating the 3D model | 5 | Mohammad | Everyone | | 8 | Creating the 3D model | 5 | Mohammad | Everyone |
-| 8 | Consulting on the 3D model | 3 | Carlotta | Everyone |+| 8 | Consulting on the 3D model | 3 | Carlota | Everyone |
 | 8 | Creating app drafts | 4 | Lena | Everyone | | 8 | Creating app drafts | 4 | Lena | Everyone |
 | 8 | Refining a section of the Project Management wiki part | 3 | Lena | Everyone | | 8 | Refining a section of the Project Management wiki part | 3 | Lena | Everyone |
Line 442: Line 442:
 | 9 | Designed seating platform | 4 | Timon & Mohammad | Everyone | | 9 | Designed seating platform | 4 | Timon & Mohammad | Everyone |
 | 9 | Updated electrical circuit design (meeting Luis) | 5 | Amalie | Everyone | | 9 | Updated electrical circuit design (meeting Luis) | 5 | Amalie | Everyone |
-| 9 | Focused on door mechanism (3D video) | 3 | Carlotta | Everyone |+| 9 | Focused on door mechanism (3D video) | 3 | Carlota | Everyone |
 | **30/04/2026 - 13/05/2026** | | | | | | **30/04/2026 - 13/05/2026** | | | | |
-| 10 | 3D model video | 4 | Carlotta | Everyone |+| 10 | 3D model video | 4 | Carlota | Everyone |
 | 10 | Packaging solution | 4 | Amalie & Timon | Everyone | | 10 | Packaging solution | 4 | Amalie & Timon | Everyone |
 | 10 | Continued writing scientific paper | 4 | Timon & Amalie | Everyone | | 10 | Continued writing scientific paper | 4 | Timon & Amalie | Everyone |
Line 496: Line 496:
 | 13 | Proposed solution documentation - scientific paper | 5 | Timon | Everyone | | 13 | Proposed solution documentation - scientific paper | 5 | Timon | Everyone |
 | 13 | Prototype Development - Structure - Scientific paper | 3 | Kai-Ko | Everyone | | 13 | Prototype Development - Structure - Scientific paper | 3 | Kai-Ko | Everyone |
-| 13 | Prototype Development - Smart Control - Scientific paper | 3 | Amlaie | Everyone |+| 13 | Prototype Development - Smart Control - Scientific paper | 3 | Amalie | Everyone |
 | 13 | Prototype Development - User Application - Scientific paper | 3 | Lena | Everyone | | 13 | Prototype Development - User Application - Scientific paper | 3 | Lena | Everyone |
 | 13 | Personal Outcomes Lena - scientific paper | 1 | Lena | Everyone | | 13 | Personal Outcomes Lena - scientific paper | 1 | Lena | Everyone |
Line 520: Line 520:
  
 ==== Sprint Outcomes ==== ==== Sprint Outcomes ====
-//*Include the outcomes of all sprint reviews (what was the sprint backlog, completion status, planned capacity vs. achieved velocity).*// 
  
 === Sprint 1 === === Sprint 1 ===
Line 558: Line 557:
 | 2 | Structural Drafts | 4 | Carlota | Everyone | | 2 | Structural Drafts | 4 | Carlota | Everyone |
 | 2 | Brainstorming Smart Building concepts | 3 | Everyone | Everyone | | 2 | Brainstorming Smart Building concepts | 3 | Everyone | Everyone |
-| 2 | Write Background and Related Work chapters | 4 | Amelia & Timon | Everyone |+| 2 | Write Background and Related Work chapters | 4 | Amalie & Timon | Everyone |
 </table> </table>
 </WRAP> </WRAP>
Line 568: Line 567:
   * Developed the "Black Box" diagrams to map out how the sensors and systems will interact.   * Developed the "Black Box" diagrams to map out how the sensors and systems will interact.
   * Carlota started the first structural sketches to visualize the egg-shaped design.   * Carlota started the first structural sketches to visualize the egg-shaped design.
-  * Amelia and Timon began writing the Background and Related Work sections for the report to provide the research foundation for our project.+  * Amalie and Timon began writing the Background and Related Work sections for the report to provide the research foundation for our project.
  
 **Current Status:** All 4 tasks for this sprint were completed on time. **Current Status:** All 4 tasks for this sprint were completed on time.
Line 611: Line 610:
 ^ Sprint ^ Task ^ Duration ^ Responsible ^ Involved ^ ^ Sprint ^ Task ^ Duration ^ Responsible ^ Involved ^
 | **19/03/2026 - 25/03/2026** | | | | | | **19/03/2026 - 25/03/2026** | | | | |
-| 4 | Detailed System Schematics | 5 | Amelia | Everyone |+| 4 | Detailed System Schematics | 5 | Amalie | Everyone |
 | 4 | Structural Drawings | 5 | Carlota | Everyone | | 4 | Structural Drawings | 5 | Carlota | Everyone |
 | 4 | Cardboard scale model of Bloem | 3 | Kaiko | Everyone | | 4 | Cardboard scale model of Bloem | 3 | Kaiko | Everyone |
Line 626: Line 625:
   * Officially rebranded the project to **Bloem** and finalized the core logo concept to match our "nature meets wellness" theme.   * Officially rebranded the project to **Bloem** and finalized the core logo concept to match our "nature meets wellness" theme.
   * Kaiko built the first physical scale model using cardboard to test the dimensions and the egg-shaped curve of the capsule.   * Kaiko built the first physical scale model using cardboard to test the dimensions and the egg-shaped curve of the capsule.
-  * Amelia and Carlota produced the detailed technical schematics and structural drawings needed for the upcoming prototype phase.+  * Amalie and Carlota produced the detailed technical schematics and structural drawings needed for the upcoming prototype phase.
   * We started working on the Project Plan and Development chapters.   * We started working on the Project Plan and Development chapters.
   * Updated our material list and created a first draft of the marketing flyer to promote Bloem's benefits.   * Updated our material list and created a first draft of the marketing flyer to promote Bloem's benefits.
Line 645: Line 644:
 | 5 | Reworking Schematic Drawings | 4 | Amalie | Everyone | | 5 | Reworking Schematic Drawings | 4 | Amalie | Everyone |
 | 5 | Creating Case Study Presentation (Ethics) | 3 | Mohammad | Everyone | | 5 | Creating Case Study Presentation (Ethics) | 3 | Mohammad | Everyone |
-| 5 | Creating the brand identity | 4 | Carlotta | Everyone |+| 5 | Creating the brand identity | 4 | Carlota | Everyone |
 | 5 | Updating marketing brand | 3 | Timon | Everyone | | 5 | Updating marketing brand | 3 | Timon | Everyone |
 | 5 | Smart System HW | 5 | Amalie | Everyone | | 5 | Smart System HW | 5 | Amalie | Everyone |
  • report/prm.1781472096.txt.gz
  • Last modified: 2026/06/14 22:21
  • by team2